Skip to content
Menu
Daniel Yakubovich
  • Foyer
  • Publications
    • Essays and Commentaries
    • Studies and Books
      • Synagogue Architecture
      • Friedrich Schröder-Sonnenstern
    • Essay series
      • Elementarium
      • Ornament and Memory — Overview
      • Guilt and Evidence — Overview
    • Newspapers and Magazines
  • Synagogue Architecture
    • On the Second Edition
    • Part I. History and the Present
      • Fraenkelufer Synagogue — Introduction
      • Synagogues — A Dialectic Between Freedom and Oppression
      • Walking a Tightrope — The Dilemma of Reconstruction
      • To Everything There Is a Season — Scattering Stones and Gathering Them
      • From Phantom to Design — Rykestrasse as the Echo of a Lost Space
      • Ashes to Ashes — New Forms of Living Memory
    • Part II. Project and Programme
      • Community Survey and Core Principles
      • Stairwell
      • Amalgam
      • In-Between Space
      • Festival Synagogue
      • Hortus Conclusus
      • Mikveh
      • Residential Citadel
      • Façade
      • Shoah Façade
      • A Look Behind the Scenes
    • Part III. Responses and Reception
      • On Air: Conversations That Endure…
      • “Architecture Cannot Heal Trauma”
      • “History Cannot Be Rebuilt”
      • “What Should the Reconstruction Look Like?”
      • “Designing Synagogues Without Jews?”
      • “Undoing Destruction Through Architecture”
      • Fraenkelufer Synagogue — Afterword (2025)
    • Acknowledgements
    • Kay Zareh (1943–2025)
    • Glossary (DE)
  • Art
    • Painting On Canvas
    • Watercolor And Mixed Media
    • Drawing and Studies
    • Art
  • new: Genealogy
  • Biography
  • Contact
  • English
    • Русский
    • Deutsch
    • English
Daniel Yakubovich Daniel Yakubovich

A Symphony of Cuts

Posted on 20. November 202620. November 2026

Reform instead of rite

← back to overview of “Debt and Evidence”

Part I.

A Paper Trail into the Earth –
Cost and control

How bureaucracy breaks down responsibility and extends the path from nail to wage

You are here: Part II.

A Symphony of Cuts –
Reform instead of rite

Saving options on a concrete, anonymized project example in figures

Part III.

The Code of Hammurabi
– Stamp, guilt and stone

Change of mentality to more responsibility and less fear

Overture: Diagnosis of the standstill

Architecture is Frozen musicIf so, then we are witnessing a global climate change in the building culture: the work is not only thawing up, it’s muddy. Part I “Aktenlauf ins Erdinnernen” the moral and legal paralysis was dissected by the question of guilt, the sound result is now evident: what was once built in a beat – with speed, clarity and compositional rigour – melted into paragraphs, leaked into test notes and drowned in a flood of norms. Editions lay like a permanent, dissonant noise over the design idea until there was only a residual noise left from the melody.

Public building is no longer the virtuoso interplay of a string quartet consisting of architects, engineers and authorities who work on a joint score in precise correspondence and mutual responsibility. It resembles a stage full of soloists: each of them sets his own tone, plays his own supplement, secures his liability, while the overall art work goes down in administrative turmoil. Whoever wants to bring back costs, time and quality to a harmonious triad needs more than technical corrections. This diagnosis is not a song but the prerequisite for reform: it is about a recomposition of decision-making power and responsibility.

This standstill is the result of decades of stratification, as it were, of ever-new voices: an increasingly strict rules governing public procurement law, a growing score of technical standards and a closely tacted sample and acceptance operation of the inspection and control bodies. The historical consequence is an increasingly finer division in the construction and planning industry since then; the Committee of Associations and Chambers of Engineers and Architects for the Honorary Order (AHO) places central differentiations of performance disciplines in the 1970s.1

Historically, this is not coincidental. It was the reaction to a crowd situation: as early as 1971, a legal synchronisation process of public works procurement procedures began in the European Economic Community (EEC)2 – as an instrument to implement the internal market freedoms of the Treaty of Rome and to open up the market for public contracts, which acted as a non-tariff market barrier. In Germany, formalisation proceedings followed in procurement law; in parallel, the fee regulations for architects and engineers (HOAI) were composed in 1976.3 At the latest from here on, every draft became a file process and every decision became a note as we know it today.The oil price crisis in 1973 also exacerbated the pressure: The price shock was not reacted with determination, but with reflexive control – in superstition, volatility forgives fewer mistakes and can only be tamed by more evidence and by closer leadership.4

It is as logical as it is fatal: market opening leads to documentation printing, documentation printing leads to more detection and testing requirements, more testing needs generates more rolls – and ultimately less decision-making courage at the place where it would have to be built.

In such an ecosystem, new roles are almost inevitably created to mitigate decision-making risks. Responsibilities are shared and ambiguities externalized – Every step is rational locally, but globally crippling and expensive. While the architect has long been considered the last generalist, a conductor who has had to hear culture, sociology, structure and financing at the same time, today’s overview increasingly disintegrates into niche specialties. The emergence of such synthetic professions as the AHO project controller, the BIM manager, the safety and health coordinator (SiGeKo) and DGNB consultants for sustainability certification only fill the resulting vacua.5

The practice of large-scale public projects shows that this is not a mere theory, in which the administrative level cannot play a part at the pace of the construction site, but actively counters it. Not infrequently, the bureaucracy with its own test clock generates exactly the extra costs that it believes to avoid. In a public construction project, for example, after years of deduction payments and audit notes, an invoice about default interest on my work table ended up – not for a disputed payment or a runaway, but systematically for each individual discount bill that the company had made during the project. The point is less the legal basis for claim than the naked possibility of degrading a construction project into an interest instrument by administrative delay.6,7 Those who only want to speed up payment procedures without structural reforms often treat only the symptom – the cost driver sits in the audit trail himself. The call for acceleration often only stimulates the increase in costs because redundant inspection bodies and feedback loops remain unaffected. Nevertheless, the retrospective must not result in historical transfiguration: Many standards are the result of necessary legal development and increased protection objectives. However, it becomes critical where quality is no longer built, but above all managed.8

In another publicly financed construction project, the renovation project of a Berlin cultural complex, the originally commissioned planning office had to be replaced due to insufficient planning9Since there was no time for a regular procurement procedure of about one year (!), a new architectural office was commissioned directly for the remaining services. The appraisal of this procedure under contract law remains uncommented.The new architect reported significant deficits in the execution planning that had been taken over – but the actual fault was in the process: the formal assignment lasted for months, problems under contract law had to be asked for health care retroactively and the offer had to be revised countless times, renegotiated and supplemented with ever new evidence. Basically, The Commission’s proposal for a directive on the approximation of the laws, regulations and administrative provisions of the Member States relating to the placing of plant protection products on the market was rejected. the height byThe office had to pre-finance over almost a year several employees who had been assigned to the project without being able to be paid reliably.

Since the state as the contracting authority is taking on an ever greater weight in the construction sector and thereby drives the state quota in the economy into a socialist-looking disproportionality, this example not only illustrates why the middle class is shrinking as the backbone of the German economy: Young architects and business founders simply cannot afford such a long pre-financing phase. However, the example also makes it clear that the state apparatus ultimately degrades to a generator of reminders and fees. The result is simple: a system that wants to prevent standstill generates it administratively – and then pays it in the form of default interest and mistrust.10

In this system, courage and responsibility are regarded as risk and risk aversion and formalities as security. Therefore, hesitation seems to have become a rationally learned survival strategy in public structures. A reform has to start here: we do not need more efficient management of the standstill, but decision-making power with clear responsibility. Not “to build faster” is the imperative of the hour, because structural and planning processes require a minimum time, but “to decide more quickly and be more clearly responsible”. The goal must be a politically supported building of competence with the client, which allows pragmatic weighing again.11

Because construction law is a matter of country law in large parts, Berlin can set decisive accents here. In the following five reform approaches are outlined and played through with 60 million euros gross project volume (KG 200–700) using the example of an anonymized, completed new public-sector building in Berlin.

One comment was allowed to be fired: we expect, examine and negotiate with a vocabulary that is not recently German and comes from the same cultural sphere as music: Budget, net, gross, in toto. But while the concepts of calculation have remained, we have lost our sense of speed. A state that only manages it now forgets to conduct. The following reform approaches therefore do not aim at a more efficient management of the standstill. They are a pace for a new action – divided into the time horizons of its effect: Allegro, Adagio and Largo.

— Annex: Reform scenario of the reference project Technical development of the time horizons Allegro, Adagio and Largo. —

The first movement of many concerts is fast, sharp and thematically clear. determined and Pressing forwardThe following reform proposals intend exactly that: resolutely strike, omit, shorten – to speed up the political, administrative and structural pace.

Radical streamlining of cash flows

Finding: The audit of cascades generates a break in time between real construction performance and administrative findings; construction supervision, project management, builders and donors read the same evidence four times. This endangers the liquidity of medium-sized construction companies, increases conflicts and can trigger construction shutdowns up to the insolvency of contractors in extreme cases. Where professional auditors are uncertain on the part of building supervision, the audit trail is extended not only by “more stages”, but by more grinding (requests and demands), i.e. by time that no longer produces any quality gain at all.12

Proposal for reform: Establishment of a maximum inspection body in the construction process (building supervision). In the medium term, it is necessary to establish a competence structure for technical building supervision as an asset manager of a (public) client. This would be possible by mandatory training on invoice and supplementary examination as a prerequisite in order to be admitted to the professional chambers and to obtain an admission for the construction site. For the entry into the list of the Berlin Chamber of Architects, proof of participation in 70 teaching units of 45 minutes of further training in specified subject areas is currently sufficient; a final examination or proof of competence is not provided for.13In the long run, basic competences need to be anchored in the study. This is intended to shift the weight to higher testing ability; the “examination of the exam”, the so-called “examination” by a project management system, will therefore become obsolete.

Cost effect: If the audit trail is today independent of the VOB specification (21 calendar days) for a construction company’s discount calculation14 On average it takes 20–40 days to disbursement. This means that less power cuts, fewer escalations and less construction time-related extras are required. The saving is 1–2 months as a cumulative gain from shortened test cycles. In the case of a construction volume of €50 million (plus €10 million construction costs), the construction time-dependent costs (construction site overhead costs, equipment maintenance, construction management, securing over waiting period, construction time-related additional remuneration claims) are in an order of 0.2% of the total contract value of a construction company per calendar week. At €50 million this corresponds to €10-20 days. 1–2 months a saving € 0.4–0.8 millionThat would be 2-3 additional ambulances.15

Concentration instead of externalisation (audit responsibility)

Finding: Any ambiguity is secured by external expert opinions, second opinions and additional control and test loops. Eliminating serial multiple tests by external experts, project controllers and authorities releases significant capacities without compromising the safety level.

Proposal for reform: The principle of undivided testing responsibility. The following applies to defined test fields (offers, supplements, invoices, statics, fire protection): A professional qualification replaces the downstream double examination; responsibility and liability are clearly assigned. Decision-making power is concentrated instead of distributed in test cascades. Decision-making power is internally concentrated rather than externalized.16

Cost effect: Reduction of redundant expert reports, coordination and control hours and their assignments. approx. € 1.0 million.17 Depending on the income, these are up to 20 gross annual salaries, 25 middle class cars or 10 rehabilitated schools.

Adjustment of the promotion and tax regime

Finding: Rigid key day logics in funding (monthly reports, quarterly reports, intermediate use proofs) generate coordination needs, cost time and bind capacities.

Proposal for reform: Transition to a support practice that accepts multi-annual realities.

Cost effect: The cost effect will be reflected in a faster handling of invoices and supplements (See first reform proposal==References==

Adagio literally means “comfortable, comfortable.” Here, reform proposals are located, which bundle responsibilities, merge procedures and need a longer preliminary stage for implementation:

Liability for technical planning and verification tests

Finding: Most construction disputes arise not only in the process, but in everyday life: changes, disabilities, deviations, consequences of deadlines and remuneration issues become legal questions because arrangement and money are coupled. Public awards are designed for traceability and file stability.18 Those who need to check and evaluate the surcharge, suitability, evaluation, review and endorsements in a legally secure manner often routinely add legal advice – less for contention than for fear of formal error. The VOB is not the problem. It contains deadlines, testing and conflict mechanisms – and yet public construction projects often run in the mode of permanent protection. The reason lies in the environment: procurement, budget and audit regimes superimpose contract law and generate false incentives. Misdecisions and formal mistakes are personally demonstrable, but structural delays due to lengthy processes to avoid wrong decisions are rarely sanctioned because responsibility is scattered. Result: Delay is often “cheap”, decision is “more expensive”. Thus, the “safe file” becomes more important than the rapid construction process; technical issues migrate into audit trails, query loops and legal flanking. Lawyers are less concerned with dispute resolution than with permanent risk shielding. If the VOB already offers mechanisms for conflict resolution, the most effective adjustment screw is not in the invention of new instruments, but in detoxification.

Proposal for reform: Reconnect responsibility and costs. Legal advice may not be used as a diffuse line of ancillary costs, which will be refinanced with the next supplementary document. A fixed number of legal inclusions per project; all in addition only with justified escalation, on request and after approval of the decision-making level. The objective is not “less right,” but less evasive right.

Cost effect: The monetary effect can be reputable only as a range, because it depends heavily on whether and how much legal clarification is required; with a project volume of €60 million, the benefit typically lies in the medium six-digit range, coarse € 0.2–0.8 millionThat would be two large children’s playgrounds in a medium-sized German city or a spacious condominium in a German big city.

Simplified building types and standard cleaning

Finding: Berlin should be at federal level for the ‘Building type E The idea behind this is that technically simple buildings – such as housing up to a certain height or schools with a regular floor plan – are subject to reduced standards. According to the Federal Ministry of Construction, fewer special technical cases and more type solutions could reduce construction costs by around 10%, which affects lower rental and purchase prices per square meter.

Proposal for reform: The Berlin building regulations must be consistently broken down. Country-specific regulations that go beyond the Federal measure – such as special energy standards, parking sets or greening obligations – must be checked for their real added value. At present, environmental requirements for solar panels on public buildings and conservation requirements for trees appear to be ideologically driven. A standard inventory check could show deletion potentials or alternative means of fulfilment (e.g. user-dependent solutions instead of rigid DIN specifications). Alternatively, an existing standard must be abolished for each new standard.

Cost effect: The introduction of a simpler construction scheme reduces costs conservatively by 5–10% (in the example of school approx. €3–6 million), mainly through reduced planning effort. Crucially, this saving must not be completely rationalised away. It is wiser, a part in Material quality and design This results in a building that is lower on the bottom line, but with more robust floors and better connections it has a longer service life – less costs and higher quality at the same time.

A particularly slow, sustained pace with a calm, dignified character. Trust instead of mistrust, responsibility instead of protection, building culture instead of process culture:

Change the procurement and contract culture

Finding: The basic question is that of economic incentives: How is built in the public sector? Promoting the widespread award logic (price before quality), in combination with rigid works contracts, a fatal “additional economy”. Bidders calculate scarcely – knowing that any change in planning and any uncertainty (ground, weather, price increases) will be negotiated later as supplements. In the event of fragmented responsibility, each actor optimizes his/her own detail; the project goal gets out of sight.

Reform proposalag A (lifecycle): Robustness and consequential costs must be worthwhile. Supplements should not primarily be based on the investment price until completion, but rather on resilient life cycle assumptions (lifecycle, life cycle and maintenance) – i.e. on a horizon longer than the term of office of a public builder or public building contractor.

Proposal for a reform B (contract and settlement model): Berlin should specifically test new ways, for example pilot projects with alliance agreements or integrated project management (IPA)19 as well as design and construction awards. Planners and performers are brought together early and jointly committed to a target cost budget; Bonus Malus rules (participation in savings, clear sharing of risks) reward project success and not addendums or increasing eligible manufacturing costsAt the same time, quality evaluation must gain appreciably in terms of awards compared to pure price weight. For the Land of Berlin as a client (e.g. Schulbauoffensive) on the other hand, a classic framework contract and role model can be seen in the publicly accessible contractual bases; an alliance agreement/IPA is not designed there as a guiding model.

Cost effect: This transformation of the building and contract culture takes time to build up know-how and adapt legal framework conditions. But the potential is immense: if all actors pursue a common goal, massive cost explosions – as in extreme cases from 30 to 60 million € – can be effectively prevented. 10–15 % (approx. € 6–9 million for the reference object) due to the loss of risk premiums, faster completion and reduced conflict density. The prerequisite for the success of such alliance models, however, is a sound preparation by building trust and external moderation in order to avoid the return into old debt assignment patterns. The fact that the fragmentation of responsibility itself inflates the planning costs shows the property planning, which under the pressure of constant replanning and documentation requirements develops its own supplementary dynamics.20

Clear protection objectives and balancing instead of rigid addition of standards

Proposal for reform: Berlin should create real discretion in its building order and administrative practice. A risk-based prioritization of protection targets enables highly economical solutions within the existing legal framework: Instead of forcing the absolute “top solution” for every hallway and room, priorities could be set. One could, for example, weigh deflustation and ground floor accessibility very high, but handle a ventilation standard more flexibly, provided that the room air quality is maintained. An “innovation or balancing protection” could be anchored. If the architecture is to become “more musical”, the conductor (the authority) needs the certainty that a misapproach in the sense of innovation does not mean the career end.

Such exceptional decisions shall include: § 67 BauO Bln (liberations, deviations) However, they are rarely used because official decision-makers on the part of the public authorities Fearing personal regressIt is therefore necessary to have a political backing which defines the balance as a deliberate practice in order to achieve the overall level of protection more efficiently.

Finding: Many costs arise because requirements are added cumulatively. The requirements for energy efficiency, accessibility, fire protection, room air quality and acoustics apply, which currently have to be fulfilled simultaneously maximum. This inevitably leads to highly complex and expensive special solutions.

Cost effect: In the anonymized example, you could do without some revision opening, RLT system or security system – savings estimated 5–8% of the total project (€3–5 million), partly as a cost reduction, partly as a buffer for quality improvements elsewhere.

The current system is not the product of collective rationality, but rather the result of a superimposition of legitimate objectives: security, equal treatment, prevention of corruption and a complete audit have piled up into a wall over decades. The problem lies in the resulting miscontrol impulses: Individual risk aversion is rewarded in the apparatus, while the courageous, pragmatic balance is punished. A non-decision remains unconsequential for the individual decision-maker – for the overall project, however, it is the most expensive condition to accept.

This is precisely the core of a real reduction in bureaucracy: it’s not about “less state”, but about better incentives, the return to individual responsibility and a standard of proof that matches the actual risk. If this realignment of responsibility is seen as a guiding principle, the five reform levers change from a mere set of measures to a necessary system diagnosis.

In addition, the tax logic works: while pre-tax refunds usually take place in a timely manner,21 forces the Tax payable on: Companies that pre-finance VAT long before actual payment – often underestimated withdrawal of liquidity, which unnecessarily endangers the economic stability of businesses.

Encore

In summary, these reforms aim to transform processal complexity into efficient solutions. The conservatively calculated savings potential is about 8–12 %; the reference project (60 million €) would correspond to around 4.8–7.2 million €. It is important that a mere summing up of the savings potential would be sub-complex to structural reality, because there must be a reinvestment flow from paper into the walls in order to optimise a new building not only in terms of expenditures but also to ensure robustness and durability of materials, detail precision and clean connections beyond completion.

The way there is tripartite, and it remains quantifiable.

  • Now (Allegro): Streamlining of test cascades, dismantling of double tests. Saving: €1.6–2.2 million (around 2.7–3.7 %). This works immediately and sends clear signals to the middle class.
  • Medium-term (Adagio): Standardisation and piloting of the “E” type of building create scope for simplicity without compromising quality. Savings: €3–6 million (5–10%).
  • Long-term (Largo): A change of mentality, supported by suitable contract and settlement models (Alliance, integrated project management) and a clever bid logic, can structurally prevent cost explosions. Furthermore, tax reform proposals are a lever. Here the potential lies at € 6–9 million (10–15%).

What does this mean in total? With ten projects of this size, we are talking about a total volume of €600 million about five double budgets. A conservative corridor of 8–12 % then corresponds to around €48–72 million – funds that can either be saved or invested in new projects. That would be 11 major projects, one school more, one theater modernization more, one apartment block more!

So far, we have been talking about levers, percentages and amounts of money. That’s necessary, but it’s not enough, because even the best score remains paper, if no one in the orchestra pit has the courage to give the job. The virtuoso interplay of the string quartet from builders, architects and authorities mentioned at the beginning has been replaced in many places by a network of soufflurs and controllers, who constantly talk the musicians into it until play becomes only a safeguard. A reform that wants to overcome this standstill must not be exhausted in technical details. It must restore responsibility. Visible. Portable.

The deeper question is not technical, but cultural: who decides when it really matters? The end is therefore devoted to the broad, worn sentence without which every building remains soulless: the courage to make a decision. It is about looking back – on how responsibility was visible in the past, how it disintegrates today, and what culture of decision we need again so that architecture can become a reality. Frozen music to make architecture sound again.

Part I.

A Paper Trail into the Earth –
Cost and control

How bureaucracy breaks down responsibility and extends the path from nail to wage

Part III.

The Code of Hammurabi
– Stamp, guilt and stone

Change of mentality to more responsibility and less fear

  1. On the differentiation of performance disciplines in the 1970s, see: AHO – Committee of the Associations and Chambers of Engineers and Architects for the Order of Honor: Issue 9. Project management in the construction and real estate industry – standards for services and remuneration. 5., completely revised edition. Available online at: https://www.aho.de/publication/heft-9/ (last access: 09.01.2026). ↩︎
  2. As early as 1971, by Directive 71/305/EEC on public works contracts, the EEC established a framework for the coordination of procurement procedures (transparency, equal treatment, opening up markets), which inevitably entailed file situation: clean publication, evaluation, documentation, verifiability – and this later also favoured the development of audit bodies and “second eyes”. ↩︎
  3. Federal Republic of Germany: Ordinance of 17 September 1976 on fees for services provided by architects and engineers (Honorary Order for Architects and Engineers – HOAI), BGBl. I, p. 2805. Available online at: https://dejure.org/BGBl/1976/ (last access: 06.01.2026). ↩︎
  4. The economic background is changing. With the oil price shock from October 1973, energy prices and inflation are rising sharply; thus, costs and future risks suddenly become politically and householdally explosive. Public authorities typically react to this not with “mute”, but with stronger control, more evidence and tighter protection because they want to forgive fewer mistakes in terms of volatility.
    See:
    Borowsky, Peter: Turnaround in the early 1970sIn: Bundeszentrale für politische Bildung (bpb): Informationen zur politischen Bildung, No. 258 “Zeiten des Wandels” (Times of Change), 05.04.2002. Available online at: https://www.bpb.de/ (last access: 07.01.2026).
    Nagel, Joachim: Monetary policy in times of geopolitical crises and high inflation. Speech at the European School of Management and Technology (ESMT), Berlin, 30.08.2022. Deutsche Bundesbank. Available online at: https://www.bundesbank.de/ (last access: 04.01.2026). ↩︎
  5. The fact that “new roles have emerged from the air” is also historically evident: project management has established itself as its own performance discipline in large-scale public construction since the 1970s, precisely as a reaction to complexity, timing and cost pressure as well as division of work. Since the services listed in § 31 HOAI 1996/2002 were not suitable for fulfilling the requirements of the contractor and contractor side to a specified performance picture for project management services, the AHO commission “Project Management/Project Management” designed a performance image for the first time in 1996.
    See feet. 1 ↩︎
  6. In the case anonymised here, a separate interest invoice of around € 7,100 was presented towards the end of the project period, which did not refer to an individual case but to all deduction/subcalculations made by the contractor (a total of 41 items over several years). The claim amount was less striking than the serial validity of default periods per invoice. In the internal audit, deviations were already found with regard to the basics: approach of maturity/delay in accordance with VOB/B (e.g. different derivation via § 16 para. 1 no. 3 or § 16 para. 5 no. 3 sentence 3), date reference (received date vs. receipt of invoice) and basis of assessment (received amount vs. audited invoice amount). As a result, the claim was significantly reduced (size order: to about one sieve), inter alia by referring to objections such as statute of limitations for older interest-rate years (§§ 195, 199 BGB) and the late, subsequent assertion; regardless of the individual result, the process illustrates the additional work and test track that arises from delayed payment processes themselves (interest calculation, counterchecking, legal reconciliation, correspondence). ↩︎
  7. The fact that the interest requirement remains only in the low four-digit range in the result does not invalidate the thesis, but shifts the focus: The decisive finding is the reproducibility of the delay over a long accounting series – and the resulting audit effort. In other words, not the amount of interest is the symptom, but the fact that the system allows a flat delay at all as a plausible narrative model. ↩︎
  8. In the past, it was not automatically better, but often simply more risky and technically simpler, with lower demands on energy, accessibility, fire protection, hygiene, acoustics, documentation and warranty – many of today’s rules have emerged from real damage cases and politically intended quality targets. ↩︎
  9. Instead of termination, no further performance levels were called up; the performance phases that have not yet been completed were to draw a surgically precise interface through a partial performance evaluation — through the building complexes, through the sub-projects and through the performance phases. ↩︎
  10. The described constellation is typical of large public existing projects: If the present planning is considered inadequate and threatens a construction standstill, there is a time pressure that practically impossible regular procurement procedures. The result is often a direct award or a narrow negotiation procedure under the guiding principle “Safeguarding the building process”. At the same time, the public hand remains bound to its test and documentation logics: offers have to be made “testable”, performance limitations are sharpened, installations are submitted, special services are justified, hourly and personnel intervention concepts plausibilized and legally/house maintenance secured. This serial protection creates a second time beam that does not run synchronously with the technical necessity of the construction site. For the commissioned architectural office this is economically difficult: project staff must hold up (plan inspection, plan coordination, coordination with specialist planners, preparation of the assignment documents, scheduling and interface clarification) although the contractual basis and thus the breakability is only gradually “closed”. In practice, this means: internal reserves and liquidity are tied, not because architecture would be “deure” but because assignment, proof and payment run as a work loop. The fact that reminders and default interest occur in this situation is less a marginal phenomenon than a consequence of the construction: delayed commissioning and delayed payment processes generate additional correspondence, counter-checks and legal assessments – thus again administrative burden, which has to do with the progress of construction only indirectly. ↩︎
  11. Individual wrong decisions are visibly sanctioned (examinations, complaints, reclaims), while courageous, pragmatic considerations are rarely rewarded – this is an incentive problem. ↩︎
  12. In the first part of the series, Guilt and Evidence Reference: In a plastic example needs a craftsman who “beats a nail in the wall” up to nine stations until this nail is booked as paid performance (Construction management → Accounting Company → Construction supervision → Project control → Public builder → whose controlling → possible donor + Court of Auditors, etc.) This bureaucratic idleness binds work capacity and liquidity – small companies cannot afford to wait for money for months, and in the worst case withdraw from the construction site, which causes further delays.
    See Yakubovich, Daniel: A Paper Trail into the Earth, Debt and proof – Part I, synagogen.org, online: https://pensarium.de/ (Version: January 2026). ↩︎
  13. Chamber of Architects Berlin: Prerequisite and procedures – entry in the list of architects and city planners, online: https://www.ak-berlin.de/ (last access 11.01.2026). ↩︎
  14. VOB/B § 16: Payment. In: Contract and procurement regulations for works – Part B (VOB/B), dejure.org, available online at: https://dejure.org/gesetze/VOB-B/ (last access: 11.01.2026). ↩︎
  15. “The purchase costs for each ambulance amount to about 260 000 euros.
    See Wilczek, Markus: Two new ambulances for more than 500,000 euros, come-on.de, online: https://www.come-on.de/ (last access: 28.01.2026) ↩︎
  16. Several bodies often control the same: planning audits by external auditors and offices, safety concepts by evaluators and construction inspectors… For example, construction supervision (architect) could take over the audit, the audit of project taxation is unnecessary if construction supervision can be properly checked. ↩︎
  17. On the basis of the above sources approximately 1.5–3.0 % of construction costs can be considered as a rough guide for project management. at € 60 million approx. € 0.9–1.8 million The AHO formulates an independent performance picture for the delegable client tasks and derives fee recommendations. The waiver of project management by strengthening the competence of public construction services — combined with a radical narrowing of formal requirements would make the additional costs necessary for the commissioning of a separate project management and thus further interfaces. In addition, there are typically second assessment and coordination costs for multiple tests (especially in case of stability/fire protection); if test engineers carry out structural inspection tasks and thereby Redundant If verification paths are omitted, an additional lower six-digit amount is plausible.
    Company OWL: Clients increasingly commissioned project controllers, 26.10.2020. Available online: https://www.unternehmen-owl.de/ (last access: 11.01.2026).
    compa: Project management at construction: Overview of tasks (AHO), 20.11.2025. Available online: https://www.compa.co/ (last access: 11.01.2026). ↩︎
  18. Audit of the Court of Auditors, regularity/economicity, internal control requirements – all this creates a climate in which the “safe file” is assessed higher than the rapid decision. In Berlin, the audit competence of the Court of Auditors and the basic logic of control are explicitly defined.
    https://www.berlin.de/sen/finanzen/ ↩︎
  19. In Berlin, there are Integrated project management and multi-party contracts already – so far visible especially in the federal building, for example at the new BAM GBD 149 in Berlin-Adlershof, which is explicitly “implemented in Integrated Project Management (IPA)” and organized through a multi-party contract. https://bundesbau.de/ ↩︎
  20. This can be seen in the planning of the object: there the sums often increase not linearly, but clearly continued via revaluations (in this example from 588.630.40 € to 915.546.79 €; +56 %). The construction side costs thus become the actual scene of systemic friction. ↩︎
  21. Financial Administration of the State of North Rhine-Westphalia: Pre-registration of VAT. Tax information – companies – VAT. Available online at: https://www.finanzamt.nrw.de/ (last access: 11.01.2026). ↩︎

© 2026 Daniel Yakubovich | E-Mail | Impressum | Datenschutzerklärung
Friedrich Schröder-SonnensternAshes to Ashes — New Forms of Living Memory
Pensarium

Daniel Yakubovich

Art and writing on architecture, memory, aesthetics and political order.

InstagramSubscribe via RSS

Explore

  • Publications
  • Sacred Architecture
  • Art
  • Genealogy

About

  • About me
  • Contact
  • Email

Language & information

  • Deutsch
  • English
  • Русский
  • Legal notice
  • Privacy policy
© 2026 Daniel YakubovichHome →